The build, step by step
How a Duplessis Pool Gets Built
The steps, in order, and who you deal with at each one. About 90 days of construction.
About 90 days, on the same sequence every time
A Duplessis gunite pool takes about 90 days to build. We build 220 to 240 pools a year on the same sequence, with dedicated crews for each phase, which is how the schedule holds without cutting cure times. Here is what happens and in what order.
Before construction
Design and price it online
Pick one of ten pool designs, set the size, choose finishes and features in the 3D Studio and watch the price update. No sales call required.
Meet your designer
We walk your yard, talk through placement and options, and adjust the design. A deposit holds your place in the build schedule.
Make your selections at the showroom
At 14663 Airline Highway in Gonzales you can compare plaster, tile and coping side by side and see upgrade options in person.
Permits and HOA
Most in-ground pools require permits, inspections and an approved safety barrier, and requirements vary by parish. We coordinate permitting and provide the renderings your HOA needs for approval.
Preconstruction meeting
Your project manager meets you at your home, explains each stage and answers questions. From here on, the project manager supervises the job day to day and is your direct point of contact.
★★★★★
Simple click-through. I was done in 10 minutes.
The 3D Studio
See your pool and its price before anyone visits
Pick one of ten pool designs, set the size, choose finishes and features and watch the price update.
- Ten gunite pool designs
- Size, finishes and features
- Live price as you choose
- No sales call required
Construction
Dig day
We lay out the pool and excavate. Dirt excavation and removal are included in every package.
Steel and plumbing
The rebar cage and plumbing lines go in.
Gunite
The concrete shell is shot and left to cure.
Tile and coping
Waterline tile and coping are set, along with any water wall or spa details.
Decking, equipment and electrical
The deck is formed and poured, the equipment pad is set, and the pump, filter and any heater or automation are installed and wired.
Plaster and fill
The interior finish goes on and the pool is filled.
Startup and Pool School
Our startup technician starts the equipment and balances the water chemistry. New plaster needs specific care in its first weeks, and we give you a checklist for it. After that, Pool School has short videos on every piece of equipment you own, the Hayward app, cleaning and troubleshooting.
What can change the schedule
Design changes, permitting, HOA approval, weather, site access and project complexity can all move the timeline. The simplest way to stay on schedule is to settle the design before dig day.
Your part during the build is small but real. We cover it in two short videos: homeowner responsibilities during the build and after the build.
Your part, in two short videos
Homeowner responsibilities during the build and after the build.
★★★★★
What really set them apart was their timeline. They completed everything within about 3.5 months while our neighbors who used other reputable companies waited 6+ months for similar projects.
Build process questions, answered
How long does it take to build a gunite pool?
A Duplessis gunite pool takes about 90 days to build. Design changes, permitting, HOA approval, weather, site access and project complexity can all move the timeline.
Who is my contact during construction?
Your project manager. They meet you at your home before construction, explain each stage, supervise the job day to day and are your direct point of contact.
Do you handle permits and HOA approval?
Most in-ground pools require permits, inspections and an approved safety barrier, and requirements vary by parish. We coordinate permitting and provide the renderings your HOA needs for approval.
What is the best way to keep a pool build on schedule?
The simplest way to stay on schedule is to settle the design before dig day.
What happens after the pool is filled?
Our startup technician starts the equipment and balances the water chemistry. New plaster needs specific care in its first weeks, and we give you a checklist for it.